RICS professional standards compliance
An annual declaration that the practice works to the current professional statement, with the registered valuer status checked where it applies.
For surveyors
A surveyor's liability outlives the instruction, so inspection notes, measurements and report dates have to stand up years after the site visit.
No account needed to see the proposed desk.
The recurring work
Every one of these has a date attached, a document behind it, and somebody who notices when it slips. This is what goes on the desk.
An annual declaration that the practice works to the current professional statement, with the registered valuer status checked where it applies.
Cover renewed each year with the limit set against the largest instruction, and run-off cover maintained for past work.
Supervision, annual registration and identity checks on clients, with source of funds evidence held on each instruction.
Annual or index-linked reviews per block or property, since a figure set years ago will not rebuild the building today.
Scheduled inspections and re-measurements for retained clients, with photographic records and dated notes kept per property.
Schedules of dilapidations served and answered against lease terms, with the response logged inside the lease timetable.
Design risk information and the health and safety file evidence held where the instruction involves design or the management of works.
External wall assessments and their renewal or review points tracked for affected buildings, with lenders and managers updated.
Access, accompanied visits and tenant notices arranged to the inspection timetable rather than to whoever answers the phone.
Instructions arrive in clusters, and the work that gets dropped is the scheduling, not the surveying. A measurement that has to be redone because a room was missed pushes the whole programme, and a schedule served late gives the other side the advantage in a dilapidations claim. The file only becomes urgent in an audit or a claim, when the notes should already be complete.
The desk works this list to its own schedule and reports what it did.
Recurring inspections, review dates and assessment cycles held per property, with a reminder raised before each one.
Access arrangements, tenant notices and key collection requested and followed up until each visit is confirmed.
Photographs, measurements, certificates and contractor information gathered per instruction and filed against the property.
Professional standards declaration, indemnity cover and registration dates prepared with the supporting records attached.
Every instruction, visit and report logged with its date and author, so the basis of a figure is retrievable years later.
The inspection, the measurement and the professional opinion stay with the surveyor. The desk arranges access, chases documents and keeps the record; it does not value a building or certify a defect.
It assembles the evidence, dates and photographs behind the report. The inspection judgement and the wording of the report stay with the surveyor.
Each property carries its assessment date and its review cycle, so a figure is revisited before it is quoted in a lease or a claim.
Instructions, visits and reports are logged with dates so the basis of an earlier figure can be recovered when a claim or a query arrives.
Start with a name, a website and one sentence about what the business does. The desk proposes the list; the surveyor corrects it.